projects executed projects under execution business strategy technical details





PROJECTS UNDER EXECUTION


MUMBRA BYPASS  NAGPUR-KONDHALI PROJECT  SEZ construction at Bavla, district Ahmedabad  LIST OF OTHER PROJECTS IN PIPELINE

















MUMBRA BYPASS:
The company was awarded the project in the year 2000 for construction of the Mumbra Bypass of the Mumbai-Pune Road at NH4 with a length of 5.41 km.

The project required competency in constructing across difficult terrain and the scope of the project was further increased in 2005 requiring the addition of a grade separator along with the construction of a Railway Over Bridge. This toll-based project enjoys a concession period of about 16 years.

Project details
• Location: Mumbai-Pune Road at NH4 from km 133/800 to km 138/200; the
  stretch is the link between NH3/ NH8 and JNPT
• Primarily project influence areas are the States of Maharashtra and Gujarat.
  Secondary service areas are southern states - Goa, Karnataka, TN, AP and
  Northern states – Delhi & MP.

Atlanta’s role
• Financing, constructing, project management, operations, maintenance and
  toll collection.


[ TOP ]









NAGPUR-KONDHALI PROJECT:
This toll-based project was awarded to Atlanta - SREI consortium in September 2006 and the scope of the work include the improvement, operation and maintenance including the strengthening and widening of the existing 2-lane road to 4-lane dual carriageway on the NH-6 (Nagpur-Kondhali section) - a stretch just outside Nagpur city in Maharashtra. A sizeable amount of inter-state and intra-state traffic passes through this route and there is no convenient alternative route to this stretch.

The company has formed a Special Purpose Vehicle (Balaji Tollways Ltd) for this purpose. Atlanta holds 74 per cent stake in it. The concession period extends to approximately 20 years including 2.5 years of construction.

Project details
• 4 laning of 40.8 kms of Nagpur-Kondhali section of NH – 3.
• Also part of NH – 6 which connects Kolkatta and Mumbai/Surat through West
  Bengal, Jharkhand, Orissa, Chattisgarh & Maharashtra.
• NH – 6 intersects NH – 3 at Dhule which connects Mumbai and Agra through
  Nasik, Indore, Dhule and Gwalior.

Atlanta’s role
• 74% stakeholder in the SPV.
• Construction, project management, operations, maintenance and toll
  collection.


[ TOP ]











SEZ CONSTRUCTION AT BAVLA, DISTRICT AHMEDABAD:
Atlanta has entered into a MoU with NG Realty Pvt. Ltd. for setting up an Engineering SEZ at Bavla, 26 kms. away from Ahmedabad. This SEZ will reap the benefits of being located in close proximity to Gujarat’s industrial and commercial capital – Ahmedabad. This strategic location is well-connected by road, rail and air. The trade potential of the place will also significantly improve due to the proposed construction of a seaport at Dholera, near Bavla. Gujarat which is home to some of the leading education institutes and majority of which are placed in Ahmedabad is leading to easy access to trained talent pool.

Project Details
• SEZ setup at Bavla recognized as Gallops Atlanta SEZ will be spread over an
  area of 230 hectares, out of which 75% will be earmarked for the processing
  area for SSI/MSI and LSI engineering units, while the remaining will be
  utilised for non-processing zone.
• Atlanta NG Realty Pvt. Ltd. will provide basic infrastructure facilities such as
   roads, drains, water supply, sewerage disposal, power distribution facilities,
   compound walls etc.
• Construction of residential buildings, commercial centers,hotels restaurants,
   entertainment facilities etc.

Atlanta’s role
• Acquired a 50% stake in Atlanta NG Realty Pvt. Ltd. an SPV formed for
  developing Gallops Atlanta SEZ.
• Construction, owning and maintaining facilities.

[ TOP ]










LIST OF OTHER INFRASTRUCTURE DEVELOPMENT PROJECTS IN PIPELINE:

Name/Nature of Work

Authority / Owner

Western Express Highway

MMRDA

Lucknow Bypass (in JV with PBA Infrastructure Limited on 50:50 basis)

NHAI

Nagpur-Kondhali section on BOT basis

Balaji Tollways

NH-5 in Orissa (in JV with Gammon India Ltd on 50:50 basis)

NHAI

S.V. Road, Mumbai

MMRDA

Western Express Highway

MMRDA

Western Express Highway

MMRDA

Construction of SEZ

Atlanta NG Realty Pvt. Ltd.


[ TOP ]






About Us Busihess Sector Hi Investor Relatiohs Contact Us
home